What does Project Design & Engineering cover?
A production facility doesn't start with an equipment list — it starts with the target product. We define what product, in what packaging, and how many tons a day you'll produce; from there we build the process flow, machine capacities and facility layout backward. Capacity calculation ties every step from raw material to finished product together with hourly and daily throughput; a single missing link slows the whole line down. The output is a block flow diagram, an itemized equipment list, enclosed-area and infrastructure needs (electrical power, steam, process water, wastewater discharge), and a scaled 3D layout plan. Our engineering team verifies your site data (m², ceiling height, door dimensions) through a site visit or video call; missing data isn't filled in with assumptions. This stage is the cheapest stage of the investment: a capacity or layout error is fixed on paper in minutes — on site it takes weeks and real money. The preliminary assessment is usually free.