ProcessTürk — Turnkey Industrial Plant Solutions

Fruit Juice & Concentrate Line

Full process from fruit to clear/cloudy juice and concentrate.

Output product

Capacity
2 – 12 t/day
Lead time
10 – 20 weeks
Approx. project-based investment
On request

Price and delivery scope depend on the selected product. Your quotation specifies whether transport, taxes, site works and installation are included.

Capacity

Capacity options for this line

2 – 5 ton/day
5 – 12 ton/day
Custom capacity (project-based)
Packaging type
PET bottleGlass bottleAseptic bagBag-in-box
Production Flow

Production Flow

Full process from fruit to clear/cloudy juice and concentrate.

Motion shows process direction, not actual production time.Reduced motion is enabled

Explore process diagram
1 Receiving & Washing 2 Sorting 3 Crushing & Pressing 4 Clarification 5 Pasteurization 6 Evaporation (Concentration) 7 Aseptic / Hot Filling 7 ADIM

Click a number on the diagram to highlight the matching step.

Line Scope

Not a single item, but a configurable production system

The list below comes from the line's real machine assignments. Quantity, optional equipment and capacity choice are clarified separately in the quotation; no price is guessed for an unselected variant.

Equipment may vary by capacity. Alternatives are not all included together. Equipment without a verified capacity mapping is confirmed when preparing your quotation.

Machines in this line

Machines that build this line

Clarifier (Cleaning Separator)
Dairy Processing
Fully automatic

Clarifier (Cleaning Separator)

High-speed separator that separates sediment, solid particles, and foreign materials in milk.

Capacity
5,000 – 15,000 L/h
Estimated investment
⁦⁦€61,525⁩ – ⁦€106,375⁩⁩
3 capacity options
View Details
Pasteurizer
Thermal Processing
Fully automatic

Pasteurizer

Continuous pasteurization unit with plate heat recovery.

Capacity
1,000 – 15,000 L/h
Lead time
8 – 14 weeks
Estimated investment
⁦⁦€50,025⁩ – ⁦€97,750⁩⁩
6 capacity options
View Details
Plate Heat Exchanger
Auxiliary Equipment
Fully automatic

Plate Heat Exchanger

Compact, high-efficiency heat transfer unit.

Capacity
According to project
Lead time
4 – 8 weeks
Estimated investment
⁦⁦$11,500⁩ – ⁦$14,500⁩⁩
View Details
Vacuum Evaporator
Thermal Processing
Fully automatic

Vacuum Evaporator

Low-temperature concentration to target brix for tomato and fruit.

Capacity
Water ejection capacity approximately 80 – 190 kg water/h
Lead time
12 – 18 weeks
Estimated investment
⁦⁦€27,025⁩ – ⁦€86,250⁩⁩
5 capacity options
View Details
4x1 Servo Linear Filling Machine
Filling & Packaging
Fully automatic

4x1 Servo Linear Filling Machine

4-injector linear machine with volumetric servo filling; nozzles rise from the bottle bottom while filling, preventing foam in foamy products.

Capacity
500 – 2,500 pcs/h
Lead time
6 – 10 weeks
Estimated investment
⁦⁦$34,500⁩ – ⁦$44,000⁩⁩
View Details
Conveyor Servo Labelling Machine
Representative image
Labeling
Fully automatic

Conveyor Servo Labelling Machine

Open-frame conveyor servo labelling system for bottles and jars.

Capacity
10–40 units/min; application dependent
Lead time
6 – 10 weeks
Estimated investment
⁦$9,999⁩
2 capacity options
View Details
Bottle Washing and Air Drying Unit
Auxiliary Equipment
Fully automatic

Bottle Washing and Air Drying Unit

An automatic unit that washes and dries bottles.

Capacity
30 – 40 Bottles per minute (2,400 bottles/h)
Estimated investment
Project-based price
View Details
Process Tank
Other Equipment
Fully automatic

Process Tank

High-performance process tank, ideal for hygienic production processes.

Capacity
500 L - 750 L - 1000 L
Lead time
5-7
Estimated investment
⁦⁦€16,500⁩ – ⁦€27,500⁩⁩
3 capacity options
View Details
Infeed Empty Bottle Feeding Turntable
Auxiliary Equipment
Fully automatic

Infeed Empty Bottle Feeding Turntable

A turntable that ensures a regular flow of empty bottles.

Estimated investment
⁦€2,400⁩
View Details
Induction Foil Cap Sealing Machine
Filling & Packaging

Induction Foil Cap Sealing Machine

Manual Pro 1500 and Mini 500 models, and automatic Auto 8000 and Auto 4000 models for aluminium foil cap sealing.

Estimated investment
Project-based price
4 capacity options
View Details
Digital Factory

The plant this line runs in

The complete plant, from raw material intake to dispatch. Click any machine for capacity and supply scope; use the modes above to isolate the product flow, the utilities and the ProcessTürk supply scope.

Who is it for?

Who is it for?

Fruit juice brand investor
Producer seeking added value in the fruit sector
Concentrate exporter
Beverage plant expanding product range

Overview

Beverage line covering washing, crushing, pressing, clarification, pasteurization, evaporation and aseptic filling.

Specifications

Specifications
Capacity2 – 12 ton/day
OutputJuice / concentrate
FillingHot / aseptic
Product Video

Product Video

Technical Documents

Technical Documents

Facility Requirements

Facility Requirements

Enclosed Area
300 – 700 m²
Installed Power
120 – 300 kW
Steam
1 – 2.5 tons/hour
Water
4 – 12 m³/hour
Operator
4 – 7 people/shift
Core Systems This Line Can Include

Core Systems This Line Can Include

  • Fruit reception and washing system
  • Sorting conveyor
  • Crushing and pressing
  • Enzyme / clarification and filtration
  • Pasteurization unit
  • Vacuum evaporation (concentrate)
  • Aseptic or hot filling line
  • Buffer tanks and transfer pumps
  • CIP cleaning system
  • Electrical panel, PLC and automation
Optional Equipment

Optional Equipment

Optical sorting Aroma recovery unit Membrane filtration Automatic CIP Aseptic filling unit Steam boiler Cooling group Water purification Laboratory equipment

Investment Rationale

It converts seasonal fruit into concentrate and shelf-stable beverages; provides export and inventory flexibility.

Installation & Commissioning

Layout, mechanical/electrical assembly coordination and full-capacity commissioning are handled by our team.

Operator Training

During commissioning your operators are trained on-site for operation, cleaning and daily maintenance.

Spare Parts & Service

A critical spare-parts list is provided with the quote; remote and on-site service support production continuity.

Customization for Your Product

Configuration is adapted by our engineers to your product characteristics, packaging, capacity and plant conditions.

What will we ask you before the quote?

These details let us offer the right scope and the right price the first time.

Product type
Capacity target
Packaging type
Installation country
Existing facility status
Power / water / air utilities
Target budget
Planned investment date
Frequently Asked Questions

Frequently Asked Questions

Which fruits can be processed?

Fruits like apple, orange, pomegranate, sour cherry, peach; the line is configured according to the fruit.

Can I produce clear or cloudy?

Both; the enzyme/filtration configuration is selected according to the target.

Will concentrate + ready-to-drink be on the same line?

Yes; both can be produced with the filling configuration.

Installation time?

Typically 3–5 weeks on-site.

Is there after-sales support?

Yes; we support your production continuity with spare-parts supply, technical support and remote/on-site service. During commissioning your operators are trained on-site for operation, cleaning and daily maintenance, and this training usually covers your entire production team. If a fault occurs, the issue is first diagnosed through remote technical support; if it cannot be resolved remotely, an on-site intervention is planned. A separate list of critical spare parts is provided together with the quotation, so you can see in advance which parts should be kept in stock. A periodic maintenance schedule and checklist are shared together with delivery. This support process applies to the same standard regardless of the country where the line is installed; differences in language or time zone do not change the quality of support. As a result, your line is supported with the same goal of uninterrupted production for years after installation.

Does the installation country affect the price?

Yes; shipping, customs, local assembly and utility costs vary by destination country and these items are confirmed in the quotation. The choice between sea and land transport is determined by distance and time constraints, and the cost of each is calculated separately. Customs duties and import procedures differ from country to country, which is why destination information is requested at the quotation stage. Local electrical voltage and grid frequency may also require adaptation of the machine, and this is stated as a separate line item in the quotation. Travel and accommodation costs for the installation team are either included in the quotation or shown as a separate item, depending on the scope of the project. This transparency lets you see the total investment cost of your project clearly in advance.

How does the warranty work for line projects?

For complete line projects, the warranty is defined per piece of equipment and stated in writing in the quotation, since each machine that makes up the line may carry a different warranty period. The warranty period generally starts from the delivery date, not from commissioning, and this distinction is clearly stated in the proposal document. If a fault occurs within warranty, it is first diagnosed through remote technical support; if the issue cannot be resolved remotely, an on-site intervention is planned and our team steps in on location. Critical wear parts are outside the warranty scope; a separate spare-parts list and stock recommendation for these items is provided together with the quotation. The warranty covers manufacturing defects, assembly errors and electrical/mechanical component faults, while damage caused by user error falls outside this scope. This structure gives even a multi-machine line investment a predictable and transparent support process.

Get an engineering pre-assessment for this line

Share your capacity target; our engineers will get back with area, equipment and estimated investment.

Chat on WhatsApp