ProcessTürk — Turnkey Industrial Plant Solutions
Single Machines

Single Machine Catalog

Pick the machine you need, see its specs and estimated price instantly.

What to check when buying a single machine

Buying a single machine looks simpler than building a line, but it is where more mistakes are made. It is not enough for the machine to run on its own; it has to fit your existing line's speed, infeed and discharge heights, electrical load and product format. One wrongly chosen machine drags every piece of equipment before and after it down to its own speed. That is why a single-machine enquiry still asks about capacity, product and the existing line. The machines below are supplied either standalone or as part of a line; technical specifications may change with your product, and the exact configuration is fixed after the pre-assessment.

Our machine range

Last updated: October 3, 2026

Category
Automation
Automatic Linear Labeling & TIJ Date Coding Unit
Labeling
Fully automatic

Automatic Linear Labeling & TIJ Date Coding Unit

A unit that automatically performs labeling and date coding processes on bottles.

Capacity
30 – 80 Bottles per minute
Estimated investment
Project-based price
View Details
Manual Labeling Machine
Labeling
Manual

Manual Labeling Machine

Economical manual-feed labeling for round containers.

Capacity
300 – 600 pcs/h
Lead time
2 – 4 weeks
Estimated investment
⁦⁦$600⁩ – ⁦$750⁩⁩
View Details
Semi-Automatic Labeling Machine
Labeling
Semi-automatic

Semi-Automatic Labeling Machine

Fast, neat labeling with a single operator.

Capacity
10 – 25 pcs/min
Lead time
3 – 5 weeks
Estimated investment
⁦⁦$1,600⁩ – ⁦$2,050⁩⁩
View Details
Full-Automatic Labeling (Cabin)
Labeling
Fully automatic

Full-Automatic Labeling (Cabin)

Conveyorized, high-speed fully automatic labeling station.

Capacity
Packaging diameter, label length and application type approximately 10 – 40 pcs/min
Lead time
6 – 10 weeks
Estimated investment
⁦⁦$7,700⁩ – ⁦$9,850⁩⁩
View Details

If I buy a single machine, who handles the installation?

Our installation and commissioning service applies to single-machine orders too; as the machine is integrated into your existing line or facility, we plan the mechanical and electrical connections and, if needed, the automation integration. You can choose between supervision-only or full installation, depending on your site team's experience; either way, commissioning is considered complete once the machine runs stably at the target capacity.

Can I combine machines from different manufacturers on one line?

Yes. Many investors add a single machine from a different manufacturer to their existing line. In that case, we first assess the capacity, connection type and automation-protocol (PLC communication) compatibility of your existing equipment; interface adaptation is included in the quote if needed. This assessment is part of the free pre-evaluation done before ordering, and it can also be carried out via video call without a site visit.

Share this page