
Auxiliary Equipment
Fully automaticPlate Heat Exchanger
Provides high heat-transfer efficiency in heating and cooling processes. Modular plate structure allows capacity scaling.
Capacity:Projeye göreAutomation:Fully automaticMaterial:AISI 316Lead time:4 – 8 hafta
Suitable Products
MilkFruit juiceLiquid food
Estimated investment
Project-based price
Exact price confirmed in quote
Capacity
Capacity options for this machine
Projeye göre
Özel kapasite (proje bazlı)
Specifications
TypePlate
MaterialAISI 316 plates
ConnectionModular
Why buy this machine from ProcessTürk?
- High efficiency
- Modular capacity
- AISI 316 food-contact surface
Packaging / Process Options
Modular plate package
Optional Features
Capacity increase plates
Installation & Commissioning
Layout, mechanical/electrical assembly coordination and full-capacity commissioning are handled by our team.
Operator Training
During commissioning your operators are trained on-site for operation, cleaning and daily maintenance.
Spare Parts & Service
A critical spare-parts list is provided with the quote; remote and on-site service support production continuity.
Customization for Your Product
The plate package is adapted to your product viscosity, temperature programme, capacity and CIP requirement.
What will we ask you before the quote?
These details let us offer the right scope and the right price the first time.
Product type
Capacity target
Packaging type
Installation country
Existing facility status
Power / water / air utilities
Target budget
Planned investment date
Frequently Asked Questions
Is this machine suitable for my product?
Technical suitability is assessed free of charge by our engineers based on your product sample and packaging; configuration is adapted if needed.
Is CE-compliant manufacturing available?
Yes; CE-compliant manufacturing and documentation options are offered based on the target market.
How do delivery and installation work?
After production a factory acceptance test (FAT) is performed; shipping, site installation and commissioning are coordinated per the project plan.
