ProcessTürk — Turnkey Industrial Plant Solutions
Lobe Pump Transfer Tank
Auxiliary Equipment
Fully automatic

Lobe Pump Transfer Tank

Transfers product from the sauce preparation platform to the filling unit. The sanitary lobe pump moves viscous products gently without damaging texture; the conical bottom allows complete drainage. Built in 1 – 2 m³ volumes according to capacity.

Capacity:1 – 2 m³Automation:Fully automaticMaterial:AISI 304Lead time:8 – 12 weeks
Suitable Products
SauceMayonnaiseViscous food
Estimated investment
Project-based price
Exact price confirmed in quote
Chat on WhatsApp
Capacity

Capacity options for this machine

1 m³
2 m³
Custom capacity (project-based)

Specifications

Volume1 – 2 m³ (by capacity)
Installed power10 kW
Dimensions1400 × 1400 × 2250 mm
MaterialStainless steel
FunctionProduct transfer to filling unit

Why buy this machine from ProcessTürk?

  • Sanitary lobe pump
  • Conical bottom, full drainage
  • AISI 304 food-contact surface
Packaging / Process Options
Process line integration
Optional Features
Custom volume according to capacity

Installation & Commissioning

Layout, mechanical/electrical assembly coordination and full-capacity commissioning are handled by our team.

Operator Training

During commissioning your operators are trained on-site for operation, cleaning and daily maintenance.

Spare Parts & Service

A critical spare-parts list is provided with the quote; remote and on-site service support production continuity.

Customization for Your Product

Tank volume and pump capacity are adapted to your product viscosity, batch volume and filling-line distance.

What will we ask you before the quote?

These details let us offer the right scope and the right price the first time.

Product type
Capacity target
Packaging type
Installation country
Existing facility status
Power / water / air utilities
Target budget
Planned investment date

Frequently Asked Questions

Is this machine suitable for my product?
Technical suitability is assessed free of charge by our engineers based on your product sample and packaging; configuration is adapted if needed.
Is CE-compliant manufacturing available?
Yes; CE-compliant manufacturing and documentation options are offered based on the target market.
How do delivery and installation work?
After production a factory acceptance test (FAT) is performed; shipping, site installation and commissioning are coordinated per the project plan.

Related machines

Plate Heat Exchanger
Auxiliary Equipment
Fully automatic

Plate Heat Exchanger

Compact, high-efficiency heat transfer unit.

Capacity
Project-based
Lead time
4 – 8 weeks
Estimated investment
Project-based price
View Details
CIP Cleaning Unit
Auxiliary Equipment
Fully automatic

CIP Cleaning Unit

3-tank automatic CIP system for in-place cleaning of tanks, pipes and machines.

Capacity
500 L × 3 tank
Lead time
8 – 12 weeks
Estimated investment
Project-based price
View Details

Get an engineering pre-assessment for this machine

Chat on WhatsApp