ProcessTürk — Turnkey Industrial Plant Solutions
How to Start a Tomato Paste Production Business: Step-by-Step Factory Guide

How to Start a Tomato Paste Production Business: Step-by-Step Factory Guide

Starting a tomato paste production plant takes six main steps: securing a reliable fresh-tomato supply, selecting the daily capacity and brix target, preparing the building and utilities (water, steam, electricity), installing the processing line — washing, crushing, evaporation, pasteurization, filling — obtaining food-production licenses, and commissioning the plant with operator training.

Tomato paste is one of the most import-dependent food categories across Africa, the Middle East and Central Asia. Nigeria, Egypt and Algeria alone import large volumes every year, while significant shares of the local tomato harvest are lost after picking because there is no processing capacity nearby. A paste plant built close to the growing regions replaces imports, converts harvest surplus into a shelf-stable product and adds value to local agriculture. This guide summarizes what an investor should clarify before ordering equipment, and how the setup process works in practice.

Step-by-Step Plant Setup

1. Secure the raw material plan

Capacity in a tomato paste plant is defined by the tonnes of fresh tomatoes processed per day. In most regions the tomato campaign lasts 60–90 days, and the true limit of your line is the volume of tomatoes you can reliably source every day of that campaign. Contract farming agreements are typically negotiated in the off-season, and the distance between fields and factory affects both fruit losses and logistics cost. Before comparing any equipment offer, put the agricultural side of the project on paper.

2. Choose the capacity and brix target

Roughly 5.5–6 kg of fresh tomatoes yield 1 kg of 28–30 brix paste, so you can convert your target finished-product volume back into a daily tomato requirement. 28–30 brix (double concentrate) is the retail standard; 36–38 brix (triple concentrate) is produced for industrial buyers and export, and requires more evaporation capacity and steam. A second decision follows: hot break processing (85–95 °C) gives higher viscosity and a stronger red colour, preferred by the ketchup and sauce industry, while cold break (60–65 °C) gives higher yield. Your target sales channel decides both.

3. Prepare the building and utilities

A closed production hall, a steam boiler, process water, sufficient electrical power and a wastewater plan should be roughly defined before the quotation stage. Tomato washing water is high-volume, so the discharge permit and pre-treatment approach belong in the licensing timeline, not after it. The exact footprint and equipment placement come from the 3D layout plan prepared during engineering.

4. Install the processing line

The process flow is: tomato reception → washing and sorting → crushing → skin and seed separation in a pulper/finisher → pre-heating → vacuum evaporation with in-line brix control → pasteurization → filling into cans, glass jars or aseptic bags → cooling, labelling and packaging. Installation covers mechanical assembly, piping and electrical-automation work, carried out on site under the supervision of the ProcessTürk engineering team.

5. Obtain licenses and food-safety approvals

Food-production permits are issued by your country's food authority — for example NAFDAC in Nigeria or the relevant ministry of agriculture in other markets. Hygiene and HACCP documentation is supported by the technical files of the line. Licensing timelines differ by country; running the applications in parallel with installation saves months.

6. Run test production and train the operators

The line is first tested with water, then with trial production batches. Operator training covers evaporator control, brix measurement, CIP cleaning and line safety. The goal is simple: when the tomato campaign opens, the plant runs at full capacity from the first week, not the last.

Required Machinery

The main equipment items of a tomato paste plant:

  • Washing and sorting conveyors — removing stones, leaves and unsuitable fruit
  • Crusher (hot or cold break) and pulper-finisher — skin and seed separation
  • Vacuum evaporator — the heart of the line, sized according to the brix target
  • Pasteurizer — thermal safety and shelf life
  • Filling unit — aseptic bag, tin can or glass jar; tin-can projects add a can seaming machine
  • CIP cleaning system, steam boiler and automation panel

The complete scope, process flow and capacity options are presented on the Tomato Paste & Processing Line page.

Capacity Options

For small-scale entry there are platform-type systems that fit into compact halls; the Modular Tomato Paste & Sauce System MACLINE is an example of this approach. Entry-level plants processing around 6 tonnes of tomatoes per day serve a regional market; the 30 tonnes/day class supports a regional brand; plants of 50 tonnes/day and above typically run aseptic production for industrial buyers and export. Higher custom capacities are engineered to project requirements.

The right capacity is derived from tomato supply, not from ambition: whatever volume you can reliably source in season, the line is sized to match it.

Investment Budget

The investment in a tomato paste plant is project-based; it is determined by capacity, brix target, automation level and packaging format. Two plants of identical capacity can differ substantially depending on whether they fill aseptic bags or tin cans. Once you share your capacity target, ProcessTürk prepares a free engineering pre-assessment within 24 hours, covering the required area, the equipment list and an approximate investment range.

Market Notes: Africa, the Gulf and Central Asia

Africa: Nigeria, Egypt, Algeria, Ghana and Sudan remain heavily import-dependent in tomato paste. A local plant near the growing regions substitutes imported product and turns harvest-season surplus — much of which is currently lost — into a storable, sellable good.

Gulf and Middle East: in Saudi Arabia, Iraq and the surrounding markets, the ketchup and sauce industry generates steady demand for high-brix concentrate as an intermediate product. Aseptic drum production opens direct B2B sales into this channel.

Central Asia: Uzbekistan and Kazakhstan have strong tomato agriculture. Local processing feeds the domestic market and carries clear export potential towards Russia and the wider CIS region.

FAQ

How much does it cost to start a tomato paste factory?

The investment depends on capacity, brix target, automation level and packaging format, so pricing is project-based rather than a list figure. Share your capacity target and ProcessTürk engineers prepare a free pre-assessment within 24 hours, including area requirements, an equipment list and an approximate investment range.

How long does the setup take?

Equipment manufacturing, site installation and commissioning together span several months; the exact schedule is confirmed in the quotation according to capacity and site readiness. To catch the tomato season, placing the order 6–9 months before the campaign is recommended.

How much space does the plant need?

Space scales with capacity: platform-type compact systems fit into small closed halls, while industrial plants need a dedicated building with a raw-material reception yard, boiler room and storage. The exact layout is produced as a 3D placement plan during the engineering phase.

How many tonnes of tomatoes make 1 tonne of paste?

Approximately 5.5–6 tonnes of fresh tomatoes yield 1 tonne of 28–30 brix paste. For 36–38 brix the ratio rises further; this figure is the basis for sizing the evaporator and the steam boiler.

What is the difference between cold break and hot break?

Hot break (85–95 °C) produces higher viscosity and a stronger red colour, preferred when selling to the ketchup and sauce industry. Cold break (60–65 °C) gives a higher yield. The decision follows your target sales channel and defines the crusher and pre-heating design.

Do you provide training and after-sales support?

Yes. The turnkey scope includes operator training, recipe and process support, spare-parts supply and after-sales technical coordination, so that after commissioning your production team can run the plant independently.

If you are planning a tomato paste investment, share your capacity target: request an engineering pre-assessment on the custom project page or reach the team directly via the contact page.

Let's plan your investment